Facility

Fabrication Hall

A backup fabrication hall of 82m x20m x10.5m (steel) is available to construct different steel sections/components of ships. The hall is fitted with 5 ton EOT. Produced sections/ components are fed to shipbuilding halls.

Equipment in fabrication hall

i)          500 ton hydraulic press

ii)         250 ton hydraulic press

iii)        350 ton hydraulic jacs

iv)        350 ton x 2 hydraulic press

v)         Plate bending machine – Plate thickness upto 10mm (Press brake machine)

vi)        Gelotine Shearing machine – Plate thickness upto 10mm (Pathak, India made)

vii)       Plate bending roll

viii)     Large bending roll

ix)        40 ton lifter

x)         Plate Straightener